Task

To make delivery, installation and commissioning of an industrial osmotic installation of 20 m3/h to an alcohol production enterprise.

02

Products used

As part of the water treatment equipment used: Grundfos pumps, Helyx 8040 membranes, Siemens controllers.

Customer

BASHSPIRT Joint Stock Company

Object

Alcoholic beverages wholesale. Production company

Year

2022

Address

Republic of Bashkortostan, Ufa

Services

Manufacture, supply, installation, commissioning of water treatment equipment

03

Result of work

Manufactured, installed, mounted and carried out commissioning of an industrial reverse osmosis plant of 20 m3/h.

Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
Industrial Reverse osmosis plant 20 m3/h
1 / 1